Traffic control in Canyon through March 29
The California Highway Patrol reports that there is one-way traffic control on Highway 70 from milepost marker 27.0 to 27.5 in the Feather River Canyon. The location is approximately 6.1 miles west of the junction with Highway 89 to 5.6 miles west (Twain Area). The work is scheduled through March 29. There is no posted length of expected delay.